Skip to main content

Deploy Scout Agent over phone

Prepare the phone channel and understand the controls on outbound calls.

Written by Carl Martin

Scout Agent phone deployment combines a usable number with calling schedules, approval rules and contact protections. Review the purpose and recipient of a call before delegating it.

Bringing Phone live can enable real calls. Review the number, recipient, purpose, schedule and approval settings first.

Before you start

You need administration access, a usable workspace number and available phone budget. Calling eligibility also depends on the recipient and current rules.

Scout Agent Permissions page showing global controls and the tool permissions introduction.

Permissions controls apply alongside channel and connection access.

Review phone deployment

  1. Open Scout → Deploy → Phone and review readiness and the channel’s current state.

  2. Confirm the workspace has the required active phone number and calling setup.

  3. Review calling hours, relevant time zones, approval rules and per-number contact thresholds.

  4. Review the do-not-call list and the owner who will receive a handoff when a call needs help.

  5. Set the channel live only after the displayed setup requirements are satisfied.

  6. Follow an approved task call and review its outcome, recap and any unresolved objective.

Check the result

The intended call is placed through a ready channel and its result appears in the task or call record. A ringing or connected call does not by itself establish that the supplier objective was achieved.

Protect contact preferences

Scout Agent does not call numbers on its do-not-call list. A recipient asking to stop being called should remain protected. Read the effect before removing a number from that list.

Use international phone numbers and verify the actual recipient. A shared switchboard and a direct contact may need different call context.

Review call costs and outcomes separately

Connected phone usage is billed separately from task outcomes. A call that does not achieve the task’s objective may still have phone usage. Check the active rate card and spending controls for your workspace.

If something does not look right

What you see

What to check

The call was not placed

Review readiness, approvals, calling schedule, do-not-call status, contact limits and budget availability.

The call ended without the objective

Read the call record and choose the next action: clarification, email, another eligible call or human handoff.

Can Scout Agent call outside the approved schedule?

Review the schedule and eligibility controls shown for the workspace and contact. Do not assume a task due date overrides them.

Continue your work

Open the relevant area in Cartograph to continue with your workspace data.

Related articles

Did this answer your question?