Skip to main content

Configure synced folders, history and mailbox sharing

Control synced folders, historical mail and access to mailbox content.

Written by Carl Martin

Each connected mailbox has its own import and sharing settings. Review these choices before importing more history or making email available to other people or tasks.

Before you start

You need a connected mailbox you control. Initial sync must finish before the product can list all folders.

Email accounts connection options for Microsoft 365, Gmail and iCloud.

Connect your own provider account from Email accounts.

Review import and sharing settings

  1. Open Settings → Email accounts, then open the intended connected account.

  2. In General → Folders, choose which folders sync. Inbox and Sent are required for incoming replies and sent-email context.

  3. Review Import history and choose the range needed for your work. A longer range starts importing older mail.

  4. Review the contacts-from-email option where available. It saves contact details such as name, email and company, rather than message bodies.

  5. Check the account’s sharing and Scout permissions. Share only the scope needed for the task or team.

  6. Return to Email you have shared to inspect existing grants and use Take back when access should end.

Check the result

The mailbox imports the intended scope, and shared email has an audience you understand. Verify actual messages after sync rather than relying only on the selected settings.

Changing the history range

A longer range imports older mail now. A shorter range leaves already imported mail in place; it is not a deletion control.

If a folder shows fewer messages in Cartograph than at the provider, inspect sync progress. The difference can clear when the next sync catches up.

Folder operations affect the provider

Creating, moving, emptying or removing a folder can affect the actual provider mailbox. Gmail label removal differs from moving mail to Trash or permanent deletion. Read the confirmation’s exact effect before proceeding.

A sync checkbox and a folder deletion are different actions. Use the setting that matches your intent.

If something does not look right

What you see

What to check

Folders are missing

Wait for the first sync, then check connection health.

A teammate still sees shared mail

Review existing sharing grants; reducing import history does not revoke an existing grant.

Does shortening history remove old mail?

No. It changes the import range while leaving already imported mail in place. Use the product’s specific retention or sharing controls for those decisions.

Continue your work

Open the relevant area in Cartograph to continue with your workspace data.

Related articles

Did this answer your question?